HASS (Highly Accelerated Stress Screen)

Test Overview

HASS (Highly Accelerated Stress Screen), also known as highly accelerated stress screening, is performed on the production line after the operating and destruct limits have been determined through HALT testing. Generally, 100% of products are required to participate in the screening. Its purpose is to ensure that manufactured products contain no latent defects, or at least to find and resolve these defects before the products leave the factory. HASS uses accelerated stress to find defective products within a short time, shorten the corrective action cycle, and identify other products with the same problems.


HASS (Highly Accelerated Stress Screen)

Test Significance

HASS is applied during the production stage to ensure that all improvements identified in HALT are implemented. HASS also ensures that no new defects are introduced due to changes in production processes or components.

Test Content

HASS includes the following:

* Pre-screening to remove latent defects that could develop into patent defects;

* Detection screening to find patent defects;

* Failure analysis;

* Corrective actions.

?

HASS testing includes three main phases:

HASS Development (HASS development phase)

Proof-of-Screen (screen verification phase)

Production HASS (HASS execution phase).

?

(1) HASS Development

The HASS profile must be based on the results obtained from the preceding HALT. Generally, the upper and lower operating limits in the combined temperature and vibration stress are reduced by 20%, while the vibration level is initially set at 50% of the destruct limit G value. Combined temperature and vibration stress testing is then performed under these conditions, and the specimen is observed for failures. If a failure occurs, it must first be determined whether it was caused by excessive environmental stress or by the quality of the specimen itself. In the former case, the temperature and vibration stress should be relaxed by 10% and the test repeated; in the latter case, the current test conditions are effective. If no failure occurs, the environmental stress should be tightened by 10% and the test repeated.

?

(2) Proof-of-Screen

When establishing the HASS profile, two principles must be observed: first, it must be able to detect latent defects that could cause equipment failure; second, the test must not damage the equipment or cause “internal injury”. To ensure that the results obtained in the HASS development phase meet these two principles, three test units must be prepared, and defects not manufactured or assembled according to standard workmanship, such as lifted components, cold solder joints and improper assembly, must be introduced into each unit. Each unit is then tested under the conditions obtained in the HASS development phase, and it is observed whether the artificial defects can be detected, in order to decide whether to tighten or relax the test conditions so that the HASS profile achieves the expected effect.

After the effectiveness verification is completed, new test units should be tested 30 to 50 times under the adjusted conditions. If no damage due to improper stress occurs, the HASS profile is considered to have passed the screen verification phase and can be used for Production HASS. Otherwise, the test conditions must be reviewed and adjusted to obtain the optimum combination.

?

(3) Production HASS

Any HASS profile that has passed the Proof-of-Screen is regarded as a fast and effective quality screening tool, but it still needs to be adjusted appropriately according to abnormalities fed back from products in customer use. In addition, when design changes occur, the test conditions need to be modified accordingly.

Obtaining quotations

Corporate name: *
Your name:*
Your cell phone and E-mail:*
Your needs:*

*For your benefit, your information will be kept strictly confidential

Submit successfully

Professional engineers will contact you quickly to provide you with appropriate solutions and look forward to meeting you~

Official Account Consulting
主站蜘蛛池模板: 密山市| 新干县| 新巴尔虎右旗| 云林县| 邮箱| 抚顺县| 卓尼县| 沽源县| 漯河市| 西乌珠穆沁旗| 漯河市| 连山| 济宁市| 四平市| 石林| 大兴区| 东光县| 论坛| 芮城县| 天津市| 霸州市| 永寿县| 定陶县| 宁强县| 改则县| 仙桃市| 顺昌县| 石泉县| 得荣县| 玛纳斯县| 乌兰察布市| 密山市| 日土县| 英德市| 玉树县| 正安县| 交口县| 康保县| 吉隆县| 丰都县| 万山特区|